Setting Up Shop 2

Workbench, Shelving and A Drawing table

4/25/2024

Wotkbench, DriftingDonkey, Class Globe 5.80, Hull # 208
Wotkbench, DriftingDonkey, Class Globe 5.80, Hull # 208
Epoxy & mixing station, DriftingDonkey, Class Globe 5.80, Hull # 208
Epoxy & mixing station, DriftingDonkey, Class Globe 5.80, Hull # 208
Drawing table, DriftingDonkey, Class Globe 5.80, Hull # 208
Drawing table, DriftingDonkey, Class Globe 5.80, Hull # 208
Wall mount tools, DriftingDonkey, Class Globe 5.80, Hull # 208
Wall mount tools, DriftingDonkey, Class Globe 5.80, Hull # 208
Drawingtable, DriftingDonkey, Class Globe 5.80, Hull # 208
Drawingtable, DriftingDonkey, Class Globe 5.80, Hull # 208
Workshop, DriftingDonkey, Class Globe 5.80, Hull # 208
Workshop, DriftingDonkey, Class Globe 5.80, Hull # 208

The Workshop is coming together nicely. There were a lot of strip glued pine bords, that were set to be scrapped, that I was able to repurpose for construction material.

It was quiet a bit of work since I don’t have a Table saw. Most of the work was done by my brand new Bosch Track saw and the Miter saw.

I already envisioned the next steps of the building procedure, so I set up the shop to efficiently build the frames.

Also, my Knees are terrible which is why I built a table to draw the Frames. If the Boat was any bigger this would have been tough to do 😊. A Straightedge and a 90° angle complement the drawing table.